  • Start of reconstruction works on deep-water berth No. 38 at NUTEP.
  • Delivery of a ZPMC STS crane for berth No. 39 at NUTEP.
  • Reached a yearly container transshipment record with 612,664 TEU.
  • Delo Group has consolidated 100% of KSK shares.
  • Record for FY2023 grain transshipment with 10.3 million tons.
  • Record for grain transshipment at the end of the 2023/2024 grain season is 9.2 million tons.
  • Set the absolute Russian record on monthly grain transshipment with 1.074 million tons.
  • The NCR credit rating agency has rated «DeloPorts» as AA.ru with a stable outlook.



  • Completion of construction and installation works and commissioning of a grain loading ship machine at the KSK grain terminal.
  • Reached an all-time high for grain transshipment at the end of the year with 8.2 million tons
  • Set the absolute record for container transshipment in March 2023 with 70,108 TEU
  • DeloPorts joined the corporate program on birth rate promotion
  • Regular automobile ferry service to Turkey launched under a new technological scheme through NUTEP
  • KSK joined the list of elevators approved by the People's Republic of China for grain deliveries to the country
  • Grain handling record by the results of season 2021/2022: 5.252 million tons



  • Absolute monthly record of container transshipment by the end of March: 58,577 TEU
  • Extension of berth conveyor line at berths Nos. 41, 40 and 40A completed. The total length exceeded 600 meters.
  • The absolute monthly record of container transshipment at the end of March is 50,518 TEUs
  • A record number of accelerated container trains have been processed – 422 trains
  • The record volume of grain transshipment at the end of September – 667,991 tons
  • The record volume of grain transshipment at the end of the year is 5.1 million tons
  • Increase in the number of transshipment equipment and planned renewal of the fleet at the NUTEP container terminal
  • Supply and commissioning of crane equipment from ZPMC for the new deep-water berth No. 38
  • Commissioning of deep-water berth No. 38 at the NUTEP container terminal
  • Absolute monthly record for container handling (45,146 TEU in December 2019)
  • The fourth and fifth tugboats commissioned
  • Simultaneous operation of tugboats at two DeloPorts terminals
  • Provision of towing services to several vessels at once
  • Reduction of vessel downtime at berths and in the roadstead while waiting for tugboats
  • Completion of silo construction and additional truck and rail receiving stations
  • Start of construction works for berth No. 40a at KSK Grain Terminal
  • Providing 100% of vessels arriving at DeloPorts terminals with towing services by Delo Service Company
  • Delivery of the 4th and 5th tugboats for Delo Service Company
  • Absolute monthly record for container handling (45,089 TEU in December 2018)
  • Start of silo construction and additional truck and rail receiving stations at KSK
  • Confirmation of DeloPorts’ rating at 'B+' with an outlook upgrade from 'stable' to 'positive' by Standard & Poor’s (S&P) rating agency
  • Establishment of Delo Service Company as a single service center for the Group’s stevedoring assets (bunkering, towing, and agency services)
  • Delivery of three tugboats for Delo Service Company and launch of towing operations at DeloPorts berths
  • Signing an agreement with ZPMC for the supply of crane equipment and special machinery as part of the investment project for the construction of the NUTEP deep-water berth
  • Refinancing of DeloPorts’ debut bond issue and placement of a new bond issue
  • Assignment of a corporate rating of ruA+ with a 'stable' outlook by the Russian agency RAEX (Expert RA)
  • Establishment of a management holding company as the final stage of the reorganization of the Delo Group
  • Completion of the construction of the connecting section to the new deep-water berth No. 38 at the NUTEP container terminal
  • DeloPorts received credit ratings BB- (Fitch) and B+ (S&P)
  • Stevedoring assets and the bunkering company were transferred to the holding company LLC DeloPorts
  • Start of construction work on the deep-water berth at the NUTEP container terminal
  • Placement of the debut issue of ruble bonds
  • DeloPorts reached record operational and financial performance
  • The three-year terminal development program was approved: a comprehensive development program for the grain terminal and the construction of a deep-water berth at the container terminal
  • The first stage of the DeloPorts investment program was completed — the total throughput capacity of the terminals increased to 9 million tons
  • Commissioning of the company's own five-track railway yard: doubling the container yard capacity and launching railway grain reception
  • Completion of the second phase of the KSK grain terminal construction. Terminal capacity increased to 3.5 million tons per year
  • Construction of a specialized Ro-Ro complex for transshipment of passenger cars
  • In December 2013, DeloPorts sold 100% of the NNK terminal to Gazpromneft Marine Bunker
  • The stevedoring assets and bunker company of the Delo Group were consolidated into the holding company DeloPorts Limited, with financial reporting consolidated under IFRS and verified by an international auditor
  • Technical modernization of the NUTEP container terminal was carried out, increasing its throughput capacity to 350,000 TEU
  • Completion of the first phase of the KSK grain terminal construction: capacity of 2 million tons per year (grain delivery by road)